Get in Touch
![](https://kasian.com/wp-content/uploads/2021/11/Edmonton-waste-management.jpg)
This large recycling facility is a key part in the City of Edmonton’s overall master plan to reduce waste. The pre-engineered structure consists of a 20 foot vertical grade separation to allow vehicles to deposit waste at the higher level. There is a drive through tunnel for rejected material below, and a substantial lower area for state-of-the-art automated materials separation. This project interfaces with existing and planned future phases.
![](https://kasian.com/wp-content/uploads/2021/11/2009-March-27-Waste-Management-Trommel-Delivery-1864-medium.jpg)
EXPLORE MORE
We’d love to get to know you
Get in touch
Get in touch
Share