Modernizing Edmonton’s recycling and waste management facilities

City of Edmonton

Year Completed

2015

Client

City of Edmonton

Location

Edmonton, AB

Size

237,000 SF

Share

Get in Touch

This large recycling facility is a key part in the City of Edmonton’s overall master plan to reduce waste. The pre-engineered structure consists of a 20 foot vertical grade separation to allow vehicles to deposit waste at the higher level. There is a drive through tunnel for rejected material below, and a substantial lower area for state-of-the-art automated materials separation. This project interfaces with existing and planned future phases.

We’d love to get to know you

Get in touch

  • This field is for validation purposes and should be left unchanged.

By clicking the above button you agree to our Terms of Service and have read and understood our Privacy Policy.